Tendering Support
MOVE Renewable is excellent in supporting Client’s during the tendering phase of a new project. We can define all requirements for: 1: cable installation 2: preferred equipment to minimise risks on cable damage 3: burial methodology and pre and post survey’s 4: GIS data management 5: As-built documentation 6: Route design and Route clearance (inclusive UXO removal) 7: Site and vessel co-ordination Furthermore MOVE Renewable can as no one else define and structure the interfaces between the several disciplines within a project and monitor those on progress and interfaces being closed out
- CABLE PROTECTION SYSTEMS
- CPNL and MOVE Renewable
- Turntable
- Tensioners
- Tendering Support
- Survey works
- Route design and Route clearance
- Reels
- Quality Assurance (QA)
- Project Managers
- Project Engineers
- Onshore HSE Representative/Support
- Offshore Lifting Supervision
- Offshore HSE Representative/Support
- Offshore Crane Operators
- Offshore Boat Landing
- Landfalls
- HSE Manager
- Health, Safety
- Environmental
- Engineering Support
- Engineering Design
- Diving
- Cable Repairs
- Cable Package Management
- Cable Installation Engineer
- Cable Installation Worksmanager
- 20ft Jointing Container/Control Cabin